Hello, After weeks of work, I can finally declare the Rattlesnake site (47.469984°, -121.820954°) open for business. We made another visit to Rattlesnake this past weekend, and managed to get 2 sectors installed at the top of the tower. There is now HamWAN service firing at about 340 degrees @ 5920MHz and about 90 degrees @ 5900MHz. The sectors were rotated counter-clockwise slightly from our regular 0 and 120 degree bearings to optimize service for the local area. We also installed a PTZ camera at the top of the Rattlesnake tower, which has been working great. Given the really long task list, we didn't get through everything in the 1 day, so we need to do another visit this weekend. The remaining items are: 1) Install ice shield for 60GHz dish on stubby tower. 2) Install shield + high speed modem on Baldi facing dish. 3) Install missing cable cushions on the tall tower. Rattlesnake should be completed at that point, and our next weekend adventure will take us to Blyn. --Bart