Really well. We got all 6 radios +
antennas installed, and 4 of the 6 CAT5 lines are running and
terminated into the building. Still need to haul 2 more lines
from the bottom of the tower and into the building. So now this
site has 3 sectors and 3 32dBi dishes for PtP links.
Nothing is powered on or configured yet, but the hardware is very
nearly done. We're facing some challenges now with spectral
usage, and hoping to work through those by cooperating with the
existing WISP in the next few days. 2 of the 3 sectors have clear
allocations but the 3rd is being decided right now. The PtP links
are also a challenge, but are far more flexible than the sector
allocations.
Also, no one died or got injured, so hurray!
Special thanks to K7ICY who came all the way from Portland to
suffer through the long day that it was.
--Bart
On 08/05/2013 01:43 PM, Kenny Richards wrote:
How did
the trip go this weekend?
Thanks
Kenny
On Wed, Jul 31, 2013 at 1:18 PM, Bart
Kus
<me@bartk.us>
wrote:
Hello,
We're on visit #4 to Baldi and trying to wrap this
deployment up. It's been a challenging site to deal with due
to lack of mounting points and strict deployment standards /
severe winter weather conditions.
We'll be meeting @ Enumclaw McDonalds @ 9:45AM this coming
Saturday. If you have a truck or a van that can carry cargo
up a rocky road, and are willing to spend your day helping
deploy the site, please let me know ASAP. You will not need
to climb, there is plenty of work for ground crew folks.
Thanks!
--Bart
_______________________________________________
PSDR mailing list
PSDR@hamwan.org
http://mail.hamwan.org/mailman/listinfo/psdr_hamwan.org
_______________________________________________
PSDR mailing list
PSDR@hamwan.org
http://mail.hamwan.org/mailman/listinfo/psdr_hamwan.org