Bob,

During the site visit in June, it was discovered the tower was missing guy wires for the top sections. This caused the top section to be 'leaning' and making the tower unsafe to climb to install the HamWAN dishes. I haven't heard anything since about the tower maintenance issues being addressed which will be required before HamWAN can be deployed.

Thanks
Kenny

On Sun, Oct 6, 2019 at 9:34 PM Bob Sampson <k6mby@olypen.com> wrote:
Good Evening,

What is the status of bringing HamWan to Blyn?


Bob Sampson
360-477-0776 (cell)