13 Jan
2021
13 Jan
'21
1:38 p.m.
Just a heads up, Baldi lost power around midnight, presumably due to the wind storm. The new generator failed to start. We've been on batteries all day, and looks like we're due to run out in about 2 hours. The 3 buildings north of the big one should be on their own generator, which is hopefully working, and HamWAN should continue to provide network service for the linked repeaters there, via the Rattlesnake microwave path. --Bart