FYI there is quite a bit of work that has been done today and will be continuing over the coming days or week or more. 1. IP changes were made to remove old address space from SnoDEM that have affected routing in some parts of the network 2. Repairs are needed and planned to be made to ETiger 3. There is an outage believed to be in the power subsystem at Baldi that has most of that site down. Repairs are hoped to happen before weather changes (others may have better timeline details. 4. I'll be going up to Lookout for minor troubleshooting of on-site DMR equipment (sorry, no climber for work on S2 - more likely in the spring) Be aware that there may be other ripple impacts throughout the network on some or all of this work. Please let the NetOps group know if there are problems with particular sites or gear. If possible, do NOT post to the larger PSDR group unless needed. Cheers, Rob Salsgiver - NR3O
participants (1)
-
Rob Salsgiver