We've had an internal thread + coordinated response on netops@ about this, but I don't think anyone's notified the PSDR list yet. Here's the current Baldi power status: The UPS has been on battery for 16 hours 6 minutes 48 seconds. There are 28 hours 20 minutes of runtime remaining. The time remaining estimate may or may not be accurate. We have shut down unnecessary loads. Camera remains operational. I also attempted to setup APC PowerChute automatic power failure -> server shutdown software. The APC appliance didn't quite work, and I need to take a 2nd pass at configuring it. It is not known at this time if this is another mains line cut, or a failure of a generator that may have been deployed. --Bart
Looks like we have 120VAC back: 10/02/2019 14:54:27 UPS: Returned from battery backup power. Not sure if that's due to generator running, or mains being restored. --Bart On 10/2/2019 12:30 PM, Bart Kus wrote:
We've had an internal thread + coordinated response on netops@ about this, but I don't think anyone's notified the PSDR list yet. Here's the current Baldi power status:
The UPS has been on battery for 16 hours 6 minutes 48 seconds. There are 28 hours 20 minutes of runtime remaining.
The time remaining estimate may or may not be accurate. We have shut down unnecessary loads. Camera remains operational.
I also attempted to setup APC PowerChute automatic power failure -> server shutdown software. The APC appliance didn't quite work, and I need to take a 2nd pass at configuring it.
It is not known at this time if this is another mains line cut, or a failure of a generator that may have been deployed.
--Bart
_______________________________________________ PSDR mailing list PSDR@hamwan.org http://mail.hamwan.net/mailman/listinfo/psdr
Wiztronics has their site cameras available online. They have a camera at their Baldi pointed at the generator panel in their container. It looks like their generator isnt active. Hopefully that means PSE has fixed the underlying issues. http://www.wiztronics.com/sites/cameras.htm Jason ________________________________________ From: PSDR <psdr-bounces@hamwan.org> on behalf of Bart Kus <me@bartk.us> Sent: Wednesday, October 2, 2019 4:38 PM To: psdr@hamwan.org Subject: Re: [HamWAN PSDR] Baldi's back on UPS power Looks like we have 120VAC back: 10/02/2019 14:54:27 UPS: Returned from battery backup power. Not sure if that's due to generator running, or mains being restored. --Bart On 10/2/2019 12:30 PM, Bart Kus wrote:
We've had an internal thread + coordinated response on netops@ about this, but I don't think anyone's notified the PSDR list yet. Here's the current Baldi power status:
The UPS has been on battery for 16 hours 6 minutes 48 seconds. There are 28 hours 20 minutes of runtime remaining.
The time remaining estimate may or may not be accurate. We have shut down unnecessary loads. Camera remains operational.
I also attempted to setup APC PowerChute automatic power failure -> server shutdown software. The APC appliance didn't quite work, and I need to take a 2nd pass at configuring it.
It is not known at this time if this is another mains line cut, or a failure of a generator that may have been deployed.
--Bart
_______________________________________________ PSDR mailing list PSDR@hamwan.org http://mail.hamwan.net/mailman/listinfo/psdr
_______________________________________________ PSDR mailing list PSDR@hamwan.org http://mail.hamwan.net/mailman/listinfo/psdr
participants (2)
-
Bart Kus -
Jason J. Hill